Source Feed: City of Ottawa News Releases
Author: City of Ottawa - Media Relations / Ville d'Ottawa - Relations avec les médias
Publication Date: May 22, 2025 - 10:24
There are several ways to review and comment on Ottawa’s new Zoning By-law
May 22, 2025
Whether you are well-versed with the issues or just learning what it's all about you are invited to review and comment on the second draft of Ottawa’s new Zoning By-law. You can use the unique tools online or attend virtual and in-person open-house events.
There are three open houses taking place:
- In-person open house
- Monday, June 2 Ben Franklin Place,101 Centrepointe Drive 6:30 to 8 pm
- Virtual open houses
- Thursday, May 29 6:00 to 8 pm
- Tuesday, June 3 6:00 to 8 pm
- Interact with the proposed zoning in your neighborhood in a 3D Digital Twin Map and visualize potential future development.
- Check out geoOttawa for the citywide updated zoning map. Be sure to turn on the “New Zoning By-law DRAFT 2” option under “Zoning Resources”.
- Compare existing zoning rules of the current Zoning By-law 2008-250 with the proposed Draft 2 Zoning with Interactive Draft 2 - Zoning Map
- Watch the instruction video to learn how to use the Interactive Zoning Tool and better understand the new Neighbourhood Zones.
- Draft 1 proposed limiting building heights in all N1/N2 zones to 8.5 metres, but R1/R2 zones to 11 metres. Draft 2 proposes three options to resolve this.
- Draft 1 proposed to replace all R4 zones with N4 zones. However, the R4 zones have density limits on how many dwelling units are allowed in a given space, whereas the N4 zones do not. A more tailored approach is proposed in Draft 2 which would result in some R4 zones changing to N3 zones with a reduced maximum density.
- Draft 1 only permitted communal parking lots for planned unit developments (PUDs) – that is, developments with more than one residential building on one lot. Draft 2 will include four options for communal parking which could be used in combination.
- Draft 1 proposed a series of maximum height steps at 6, 9, 18 and 25 storeys, increasing based on distance from abutting low-rise property. In Draft 2, instead of steps, a buffer area of a given depth is proposed to ensure space for adequate transition.
Canada Post workers will be staying on the job, despite contract talks between the Crown corporation and the Canadian Union of Postal Workers falling short.In a statement Thursday night, CUPW said its members are being called on to refuse overtime work starting at midnight local time across the country. The news comes as the union was in a position to legally strike as of midnight.
May 23, 2025 - 00:21 | Meera Raman | The Globe and Mail
Thirteen months before the FIFA World Cup kicks off, the City of Toronto is still wondering how to pay for it.The cost of hosting six games in Toronto has been pegged at $380-million, with the federal government contributing $104-million and Ontario, including services, $97-million. Toronto’s tab is $178.7-million (47 per cent of the total cost).But a city staff report says the cost of providing services related to public transport, policing and hospitals, among others, has increased to almost $40-million in total – reducing the provincial cash contribution and adding to the city’s bill...
May 22, 2025 - 22:59 | | The Globe and Mail
The Ottawa Charge was 15.4 seconds from getting one hand on the Walter Cup. Read More
May 22, 2025 - 22:46 | Don Brennan | Ottawa Citizen
Comments
Be the first to comment