Bank Street and Heron Road intersection to reopen with reduced lanes | Unpublished
Hello!
Source Feed: City of Ottawa News Releases
Author: City of Ottawa - Media Relations / Ville d'Ottawa - Relations avec les médias
Publication Date: August 25, 2025 - 15:47

Bank Street and Heron Road intersection to reopen with reduced lanes

August 25, 2025
: Lane reductions at Heron Road and Bank Street begin Friday, August 29

The Heron Road and Bank Street intersection will reopen as planned on Friday, August 29. Lane reductions will be in place to accommodate further utility work and road reconstruction in the area. Lane reductions are expected to continue until the end of 2025 as part of Phase 1 of the Bank Street Renewal Project.

Lane reductions

The Bank Street and Heron Road intersection will be reduced to one lane, with eastbound and westbound access maintained at all times.

  • Lane reduction on Bank Street will extend between the Transitway and Heron Road
  • Lane reduction on Heron Road will extend between Alta Vista Drive and Kaladar Avenue

The placement of lane reductions may change as work progresses. Turning lanes will be maintained throughout the work. Please allow for extra travel time when going through this area.

Access to local businesses

Bank Street businesses remain open during construction. Construction work will be coordinated to ensure uninterrupted customer access to local businesses.

Traffic impacts

Traffic delays around the construction zone are expected. Signage will be in place to notify residents and commuters of the impacted area.

OC Transpo

OC Transpo routes may be delayed during this time. For more detailed information, visit OCTranspo.com/alerts. Please allow a few extra minutes for your travels. 

Pedestrians

Pedestrian access will be maintained through the work zone at all times. Cyclists will be able to dismount and use the pedestrian route.

Progress to date

  • The current work in Phase 1 of the Bank Street Renewal Project includes the installation, rehabilitation and replacement of underground infrastructure including watermains, sanitary sewers and storm sewers. Installation has been successfully completed at the Bank Street and Heron Road intersection.
  • Additional completed watermain work includes the installation of new watermains between Riverside Drive (eastbound) and Belanger Avenue as well as three large diameter watermain repairs.
  • The installation of the new storm sewer between Sawmill Creek and Heron Road is complete, as are new storm and sanitary sewer connections between Bank Street and Kilborn Place, Randall Street and Evans Boulevard.
  • The retaining wall on the east side of Bank Street, south of Kilborn Place, has been successfully replaced.
  • Construction of the road, median, sidewalk, cycle track and traffic signals between Riverside Drive (eastbound) and the Transitway is 75 per cent complete. Utility pole replacements in this area have been completed.

Phase 1 will include full reconstruction of the road and sidewalks. It will also add a cycle track, new street lighting, traffic signals and streetscape improvements.

Stay informed

For more information on City programs and services, visit ottawa.ca, call 3-1-1 (TTY: 613-580-2401) or 613-580-2400 to contact the City using Canada Video Relay Service. You can also connect with us through Facebook, X (formerly Twitter)



Unpublished Newswire

 
Canada and South American bloc Mercosur will resume negotiations for a free-trade agreement, Brasilia and Ottawa announced on Monday after a meeting in Brazil's capital.
August 25, 2025 - 18:45 | Globalnews Digital | Global News - Canada
Canada and South American bloc Mercosur will resume negotiations for a free-trade agreement, Brasilia and Ottawa announced on Monday after a meeting in Brazil’s capital.Mercosur, whose rotating presidency is currently held by Brazil, is a major exporter of beef, soybeans and minerals. Besides Brazil, the bloc includes Argentina, Uruguay and Paraguay, while Bolivia is in the process of becoming a full member.
August 25, 2025 - 18:33 | | The Globe and Mail
Joan Leishman was a globe-trotting journalist, a champion of refugee writers in Canada and a tireless human-rights advocate. She spent more than 30 years in the employ of the CBC, in radio and television. In 1992, she opened the broadcaster’s first South African bureau as the apartheid era ground to an end after the release of Nelson Mandela in 1990, which she had covered for CBC. While based in Africa, she also covered the Rwandan genocide. Earlier in her career she had worked as a freelancer in Mexico City when a massive earthquake devastated parts of the city.
August 25, 2025 - 18:16 | James Cullingham | The Globe and Mail